Project Cases

Home / Project Cases /Steel Foot Bridge of Jinan Metro Line 8 Station

Steel Foot Bridge of Jinan Metro Line 8 Station

Share:

Hongrui supply the light steel structure products for the construction of Jinan (Capital of Shandong, China) Metro Line 8, mainly for the embedded steel structure and steel foot bridge of Cailong Road Station and Chunbo Road Station.

Overview of Cailong Road Station Project:

Cailong Road Station is located on the east side of the intersection of Jingshi East Road and Caixi Road, and is set up along Jingshi East Road in the east-west direction. The main body of this station is an elevated three-storey island platform station in the middle of the road. There are two entrances and exits in the station, the A entrance and exit foot bridge is located on the north side of the station, with a width of 6.6m and a length of about 31.85m, one side is connected to the A entrance and exit, and one side is connected to the main body of the station, and the B entrance and exit overpass is located on the south side of the station, with a width of 6.6m and a length of about 53.5m.The elevator is a steel frame structure, the staircase is a concrete structure.

The total tonnage of materials used for the flyover is 260 tons, and the material is made of high-standard Q355C.

Surface spraying of the structures: primer + intermediate paint + thin coating fire retardant coating + top coat, these four layers of painting not less than 80μm.


Overview of Chunbo Road Station Project:

Chunbo Road Station is located on the west side of the intersection of Jingshi East Road and Chunbo Road, and is set up along Jingshi East Road in the east-west direction. There are two entrances and exits in the station, and the entrances and exits are connected to the main body of the station by an foot bridge. The width of the foot bridge is 6.6m, the A entrance and exit overpass is supported by columns on the road side, the span of the foot bridge is 42.68m, and the span of the B entrance and exit overpass is 28.46m, and the steel truss structure is adopted, and the overpass bearing adopts spherical hinge bearing; The entrance and exit floors and piers are made of concrete structure, and the rest of the parts are made of steel structure: the escalator canopy is made of steel trusses: the stairs and elevators are disjointed. The elevator is a steel frame structure: the staircase is a concrete structure.

Total tonnage of materials: 270 tons, the material is made of the standard of Q355C material.

Surface spraying: primer + intermediate paint + thin coating fire retardant coating + top coat, and these four layers of painting not less than 80μm.

Steel Foot Bridge of Jinan Rail Transit Line 8 Station

Steel Foot Bridge of Jinan Rail Transit Line 8 Station

Steel Foot Bridge of Jinan Rail Transit Line 8 Station






< Wind and Solar Complementary Light Use in Tourist Avenue around Qinghai Lake Tibet Motorway Tunnel Bracket on the Snowy Plateau and River >

Hot Products

Latest Project Cases

Tunnel Lighting Improvement Solution at Duku Highway, Xinjiang

Tunnel Lighting Improvement Solution at Duku Highway, Xinjiang

National Highway 217 Dushanzi to Kuqa section, referred to as Duku Highway, is an important highway connecting the north and south of Xinjiang, and is also known as "Heavenly Highway". This highway stretches across mountains and valleys, as the

Learn More
Wind and Solar Complementary Light Use in Tourist Avenue around Qinghai Lake

Wind and Solar Complementary Light Use in Tourist Avenue around Qinghai Lake

In the second half of 2024, Shandong Hongrui obtained the project to supply lightings and traffic poles for Tourist Avenue Around Qinghai Lake. The project is the main entrance way to go to Qinghai Lake Scenic Area from Xi'ning City. It is located in

Learn More
Steel Foot Bridge of Jinan Metro Line 8 Station

Steel Foot Bridge of Jinan Metro Line 8 Station

Hongrui supply the steel structure products for the construction of Jinan (Capital of Shandong, China) Metro Line 8, mainly for the embedded steel structure and steel foot bridge of Cailong Road Station and Chunbo Road Station.

Learn More
Tibet Motorway Tunnel Bracket on the Snowy Plateau and River

Tibet Motorway Tunnel Bracket on the Snowy Plateau and River

In November 2023, Shandong Hongrui signed the contract to supply cable tray and tunnel pipe brackets to the Tibet National Highway Lhasa to Shigatse Airport Section.

Learn More

Get in Touch

Our team works with you during every phase of the project.

Contact Us